At Solarpunk Futures, we’ve always believed that building regeneratively shouldn’t be a privilege — it should be a possibility. But belief alone isn’t enough. To shift mindsets and mainstream sustainable construction, we have to prove it — not just in theory, but on the ground, brick by brick. To test this, we’re designing and executing a prototype project for Serie’s new architectural office in Goa (Sangolda) where we put our core thesis to the test: 



Can we build beautifully, consciously, and cost-effectively — all at once?

Project Opportunity

To test this, we’re designing and executing a prototype project for SIE’s new architectural office in Goa (Sangolda).

Objective

1. Showcase Practical Beauty
Demonstrate that Solarpunk Futures can deliver aesthetically compelling, high-functioning structures within conventional cost constraints, proving that sustainable design is viable even at modest scales.

2. Test Affordability with CSEB
Evaluate if a Compressed Stabilized Earth Block (CSEB)-based design can achieve a ₹2,500/sq.ft cost benchmark, without compromising on structural integrity, finish quality, or ecological responsibility.

3. Create a Live Working Prototype
Use this build as a test bed for systems and execution, focusing on:

  • Construction detailing

  • Material sourcing, supply chain, and on-ground logistics

  • Craftsmanship standards, finish quality, and scalable construction practices

Stages & Next Steps

01 / Concept

  • Finalize the core design direction

  • Prepare basic drawings and preliminary cost estimates

  • Align on overall vision and feasibility

02 / Detailing

  • Develop detailed architectural and construction drawings

  • Generate a comprehensive costing breakdown

  • Integrate inputs from Kapil, Cri, and extended team

  • Prepare TCP submission for local approvals and permissions

03 / Execution

  • Begin on-site construction

  • Maintain real-time documentation of the process

  • Capture key challenges, innovations, and learnings for future scalability

A Site Under Water

A Site Under Water

Formula 3 Racetrack & UHPC Factory

Formula 3 Racetrack & UHPC Factory

© 2025 Solarpunk Futures. All Rights Reserved. | Privacy policy | Terms of service

© 2025 Solarpunk Futures. All Rights Reserved. | Privacy policy | Terms of service

© 2025 Solarpunk Futures. All Rights Reserved. | Privacy policy | Terms of service

© 2025 Solarpunk Futures. All Rights Reserved. | Privacy policy | Terms of service